home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / STSKITS / STS_51.QUI < prev    next >
Text File  |  1993-07-04  |  4KB  |  157 lines

  1. =--=--=START=--=--= NASA Spacelink File Name:6_2_2_46_3_4.TXT
  2.  
  3. STS-51 QUICK-LOOK
  4.  
  5. Launch Date/Site:               July 1993, Kennedy Space Center - Pad 39B
  6.  
  7. Launch Time:                    TBD
  8.  
  9. Orbiter:                        Discovery (OV-103) - 17th Flight
  10.  
  11. Orbit/Inclination:              160 nautical miles/28.45 degrees
  12.  
  13. Mission Duration:               8 days, 21 hours, 59 minutes 
  14.  
  15. Landing Time/Date:              TBD
  16.  
  17. Primary Landing Site:           Kennedy Space Center, Fla.
  18.  
  19. Abort Landing Sites:            Return to Launch Site - KSC, Fla.
  20. Transatlantic Abort landing:    Banjul, The Gambia;
  21.                                 Ben Guerir, Morocco; Moron, Spain
  22.                                 Abort Once Around: Edwards AFB, Calif.
  23.  
  24. Crew:                           Frank Culbertson, Commander (CDR)
  25.                                 William Readdy, Pilot (PLT)
  26.                                 Jim Newman, Mission Specialist 1 (MS1)
  27.                                 Dan Bursch, Mission Specialist 2 (MS2)
  28.                                 Carl Walz, Mission Specialist 3 (MS3)
  29.  
  30.  
  31. Cargo Bay Payloads & Activities
  32.      Advanced Communication Technology Satellite/Transfer Orbit
  33.       Stage (ACTS/TOS)
  34.      Orbiting Retrievable Far and Extreme Ultraviolet Spectrometer-
  35.        Shuttle 
  36.      Pallet Satellite (ORFEUS-SPAS)
  37.      Limited Duration Space Environment Candidate Materials
  38.       Exposure (LDCE)
  39.  
  40. In-Cabin Payloads
  41.      Air Force Maui Optical Site (AMOS)
  42.      Auroral Photography Experiment-B (APE-B)
  43.      Commercial Protein Crystal Growth (CPCG)
  44.      Chromosome and Plant Cell Division in Space (CHROMEX)
  45.      High Resolution Shuttle Glow Spectroscopy-A (HRSGS-A)
  46.      IMAX
  47.      Investigations into Polymer Membrane Processing (IPMP)
  48.      Radiation Monitoring Equipment-III (RME-III)
  49.  
  50.  
  51.  
  52.  
  53.    STS- 51 PAYLOAD AND VEHICLE WEIGHTS
  54.  
  55. Vehicle/Payload Pounds
  56. Orbiter (Discovery) empty and 3 SSMEs    173,117
  57. Advanced Communications Satellite/Transfer Orbit Stage    26,756
  58. ACTS Support Equipment     6,394
  59. ORFEUS/SPAS      7,070
  60. LDCE/GAS can     770
  61. APE        41
  62. CHROMEX   69
  63. CPCG     70
  64. HRSGS    91
  65. IMAX Camera System         320
  66. IPMP      20
  67. RME       7
  68. DSOs/DTOs       162
  69. Total Vehicle at SRB Ignition     4,525,219
  70. Orbiter Landing Weight     203,639
  71.  
  72.  
  73.  
  74.  
  75.    STS-51 SUMMARY TIMELINE
  76.  
  77.  
  78. Flight Day One  
  79. Ascent  
  80. OMS-2 (160 n.m. x 161 n.m.)     
  81. Remote Manipulator System checkout      
  82. CHROMEX check   
  83. CPCG activation 
  84. RME activation  
  85. ACTS/TOS deploy 
  86. RCS, OMS Separation burns       
  87. (161 n.m. x 173 n.m.)
  88.  
  89. Flight Day Two  
  90. OMS, RCS burns (158 n.m. x 159 n.m.)    
  91. ORFEUS/SPAS checkout    
  92. ORFEUS/SPAS release     
  93. RCS Separation burns (158 n.m. x 159 n.m.)      
  94. CHROMEX check   
  95. Cabin depress to 10.2 psi       
  96.  
  97. Flight Day Three        
  98. Stationkeeping burns (158 n.m. x 159 n.m.)      
  99. IPMP activation 
  100. CHROMEX check   
  101.         
  102. Flight Day Four 
  103. EMU checkout    
  104. Stationkeeping burns (158 n.m. x 159 n.m.)      
  105. RME check       
  106.         
  107. Flight Day Five 
  108. Extravehicular activity preparations    
  109. Extravehicular activity (six hours)     
  110. Stationkeeping burns (158 n.m. x 159 n.m.)      
  111. CHROMEX check   
  112.  
  113. Flight Day Six
  114. Stationkeeping burns (158 n.m. x 159 n.m.)
  115. APE setup
  116. HRSGS setup
  117. CHROMEX check
  118. LDCE operations
  119.  
  120. Flight Day Seven
  121. Stationkeeping burns
  122. (158 n.m. x 159 n.m.)
  123. LDCE operations
  124. APE operations
  125. HRSGS operations
  126. HRSGS stow
  127. CHROMEX check
  128. RME check
  129.  
  130. Flight Day Eight
  131. ORFEUS/SPAS rendezvous
  132. ORFEUS/SPAS berth
  133. CHROMEX check
  134. DTO 412: Fuel Cell shutdown
  135.  
  136. Flight Day Nine
  137. Cabin repress to 14.7 psi
  138. Flight Control Systems checkout
  139. Reaction Control System hot-fire
  140. AMOS
  141. CHROMEX check
  142. Cabin stow
  143. DTO 412: Fuel Cell restart
  144.  
  145. Flight Day Ten
  146. Deorbit preparations
  147. Deorbit burn
  148. Entry
  149. Landing
  150.  
  151.  
  152.  
  153.  
  154.  
  155.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  156. =--=--=-END-=--=--=
  157.